What preparations should be made before installation and installation of solar led street lights

What preparations should be made before installation and installation of solar led street lights Before installation and installation of the solar led street light, it is necessary to determine the position of the light; survey the geological conditions, if the ground surface is 1 meter 2 soft soil, the depth of excavation should be deep; at the same time, confirm that there are no other facilities (such as cables, pipelines, etc.) under the excavation position, street lights The sunshade cannot be placed on the top for a long time, otherwise the position should be changed appropriately. Reserve (excavate) a 1.3m pit that meets the standard for installing lamps; position the pouring parts. The embedded components are placed in the middle of the square pit, one end of the PVC threading pipe is placed in the middle of the embedded parts, and the other end is placed in the battery for storage.

Pay attention to put the foundation pit in place, so that the base and the foundation pit are on the same level (or according to the needs of the site, the top of the screw rod and the level of the original ground are the same), and the other side should be parallel to the road, so as to ensure that the light pole The rear end is upright and not biased. Then use C20 to pour and fix it. When pouring, the vibrating rod should not be stopped to vibrate to ensure that the whole is dense and firm. After the construction is completed, it should be cleaned in time.

GET IN TOUCH WITH Us
recommended articles
FAQs News Cases
It can be used to test the tensile strength of wires, light strings, rope light, strip light, etc
Great,weclome to visit our factory, we are located in No. 5, Fengsui Street, West District, Zhongshan, Guangdong, China ( Zip.528400 )
No, it won't. Glamor's Led Strip Light use special technique and structure to avold color change no matter how you bend.
Every month we can produce 200,000m LED Strip Light or neon flex,10000pcs of motif lights, 100000 pcs of string lights in total.
We offer free technical support, and we will provide replacement and refund service if any product problem.
Usually our payment terms are 30% deposit in advance, 70% balance before delivery.Other payment terms are warmly welcome to discuss.
It will take about 3 days; mass production time is related to quantity.
Yes, we accept customized products. We can produce all kinds of led light products according to your requirements.
Yes,all of our Led Strip Light can be cut. The minimum cutting length for 220V-240V is ≥ 1m, while for 100V-120V and 12V & 24V is ≥ 0.5m. You can tailor the Led Strip Light but the length should always be an integral number,i.e.1m,3m,5m,15m ( 220V-240V);0.5m,1m,1.5m,10.5m ( 100V-120V and 12V & 24V ).
Please contact our sales team, they will provide you with all the details
no data

Excellent quality, international certify standards and professional services help Glamor Lighting becoming a high-quality China decorative lights supplier. 

If you have any question, please contact us.

Phone: + 8613450962331

Email: sales01@glamor.cn

Whatsapp: +86-13450962331

Phone: +86-13590993541

Email: sales09@glamor.cn

Whatsapp: +86-13590993541

Copyright © 2025 Glamor Optoelectronics Technology Co.,Ltd. - www.glamorled.com All Rights Reserved. | Sitemap
Customer service
detect